The City is involved in construction projects around Tacoma as listed below. The general project information was updated throughout each project phase as information became available to the project contacts, construction managers, inspectors and engineers. Although this page lists only completed construction projects, the
Active Construction Projects around Tacoma are also viewable.
| South 80th Street Storm Sewer Replacement (Trafton to Alaska Street) |
10/31/2011 |
3/5/2012 |
9/6/2011 |
| Central Treatment Plant Diesel Tank Replacement |
9/19/2011 |
11/28/2011 |
12/5/2011 |
| Tacoma Landfill Gas Probe Station Abandonment |
8/30/2011 |
12/6/2011 |
12/13/2011 |
| Flett Creek Holding Basin Maintenance |
8/1/2011 |
9/1/2011 |
4/13/2011 |
| Cheney Stadium Sustainable Stormwater Project |
7/19/2011 |
9/21/2011 |
11/21/2011 |
| Lemay Access Road |
6/28/2011 |
9/19/2011 |
12/20/2011 |
| Lemay Access Road |
6/28/2011 |
9/19/2011 |
12/20/2011 |
| Sanitary Sewer Rehabilitation - Puget Gulch |
4/26/2011 |
7/11/2011 |
4/2/2012 |
| A - Street Closure |
4/25/2011 |
6/1/2011 |
4/12/2011 |
| A - Street Closure |
4/25/2011 |
6/1/2011 |
4/12/2011 |
| 13th and A Street Vaulted Sidewalk Repair |
3/24/2011 |
6/2/2011 |
12/20/2011 |
| Central Area Landfill Closure Phase I |
3/8/2011 |
6/13/2011 |
2/21/2012 |
| Morton Washout |
1/21/2011 |
3/4/2011 |
9/8/2011 |
| Commerce Street Station |
1/17/2011 |
5/9/2011 |
9/30/2011 |
| Commerce Street Station |
1/17/2011 |
5/9/2011 |
9/30/2011 |
| EPS Recycling Facility |
1/11/2011 |
4/15/2011 |
10/3/2011 |
| Lincoln Ave - Portland to Mar Ave (Bridge) |
12/14/2010 |
5/31/2011 |
3/9/2012 |
| Lincoln Ave - Portland to Mar Ave (Bridge) |
12/14/2010 |
5/31/2011 |
3/9/2012 |
| Sauro Property Parking Lot |
12/7/2010 |
2/11/2011 |
8/2/2011 |
| Foss Waterway Seaport |
11/9/2010 |
1/14/2011 |
8/3/2011 |
| Titlow Beach Seawall Repair |
11/1/2010 |
1/10/2011 |
2/13/2012 |
| Titlow Beach Seawall Repair |
11/1/2010 |
1/10/2011 |
2/13/2012 |
| North End Treatment Plant - Disinfection System Replacement |
10/18/2010 |
1/3/2011 |
4/5/2011 |
| China Lake Pump Station AN2111 Pump and Valve Installation |
9/2/2010 |
10/28/2010 |
4/14/2011 |
| Marine View Drive Pump Station AN4103 Force Main Replacement |
8/13/2010 |
11/5/2010 |
4/21/2011 |
| Top 4 Bike Trails Design |
7/19/2010 |
10/18/2010 |
3/10/2011 |
| Top 4 Bike Trails Design |
7/19/2010 |
10/18/2010 |
3/10/2011 |
| 6th Avenue Parking |
6/29/2010 |
8/30/2010 |
8/15/2011 |
| Fife Street Parking and Overlay Project |
6/29/2010 |
8/30/2010 |
8/15/2011 |
| Fife Street Parking and Overlay Project |
6/29/2010 |
8/30/2010 |
8/15/2011 |
| CTP Safety Improvements for Personnel - Tagro Push Walls |
6/16/2010 |
8/10/2010 |
6/8/2010 |
| Landfill Administration Building/Shop 4 Improvements |
6/8/2010 |
9/2/2010 |
10/17/2011 |
| Tacoma Dome Parking Lot C Surface Water & Sanitary Sewer Utility Relocation |
6/1/2010 |
8/30/2010 |
7/8/2010 |
| North 11th Jackson Street ( Scott Pierson Trail) |
6/1/2010 |
8/6/2010 |
5/19/2011 |
| LID8651-1,2,3, & 4 Four Streets (Group L) |
5/18/2010 |
8/9/2010 |
3/27/2012 |
| LID8651-1,2,3, & 4 Four Streets (Group L) |
5/18/2010 |
8/9/2010 |
3/27/2012 |
| North 26th Street ADA Ramp upgrades |
5/4/2010 |
6/28/2010 |
5/23/2011 |
| North 26th Street ADA Ramp upgrades |
5/4/2010 |
6/28/2010 |
5/23/2011 |
| Salishan Area 2B Landscaping & Irrigation |
4/30/2010 |
8/9/2010 |
5/6/2010 |
| Rehabilitation of the Spanish Steps |
4/27/2010 |
8/2/2010 |
5/19/2011 |
| South 34th Street Signal |
4/9/2010 |
7/2/2010 |
10/29/2010 |
| 2008 Sidewalk Maintenance Program - Phase 3 |
4/6/2010 |
7/27/2010 |
2/18/2010 |
| 2008 Sidewalk Maintenance Program - Phase 3 |
4/6/2010 |
7/27/2010 |
2/18/2010 |
| 2010 Sidewalk Ramp Construction |
4/6/2010 |
6/21/2010 |
6/14/2010 |
| 2010 Sidewalk Ramp Construction |
4/6/2010 |
6/21/2010 |
6/14/2010 |
| Portland Ave. Overlay - E 28th to E 56th ST |
3/30/2010 |
6/1/2010 |
9/29/2010 |
| Portland Ave. Overlay - E 28th to E 56th ST |
3/30/2010 |
6/1/2010 |
9/29/2010 |
| Varco Road Improvements |
3/24/2010 |
5/25/2010 |
6/8/2010 |
| Solid Waste Management Recovery and Transfer Center |
3/16/2010 |
8/3/2010 |
12/1/2011 |
| LID8644-1,2,3,4, & 5 Five Alleys (Group I) |
3/16/2010 |
6/21/2010 |
11/14/2011 |
| LID8644-1,2,3,4, & 5 Five Alleys (Group I) |
3/16/2010 |
6/21/2010 |
11/14/2011 |
| Jefferson Street Surface Water Improvement Project |
3/16/2010 |
6/15/2010 |
12/6/2010 |
| Foss Waterway North Moorage Float Phase II |
3/16/2010 |
5/12/2010 |
3/22/2011 |
| Snake Lake Water Quality Project |
3/8/2010 |
6/7/2010 |
7/22/2011 |
| Gas Extraction System Rehabilitation |
3/2/2010 |
6/14/2010 |
7/21/2010 |
| Tacoma Rail C-Line Improvements |
2/2/2010 |
6/1/2010 |
7/11/2011 |
| Pacific Ave Pedestrian and Bike improvements |
1/20/2010 |
5/4/2010 |
11/14/2011 |
| Pacific Ave Pedestrian and Bike improvements |
1/20/2010 |
5/4/2010 |
11/14/2011 |
| Site 11 Esplanade (Foss Harbor) |
12/4/2009 |
2/1/2010 |
6/22/2011 |
| Bulbout_Crosswalk Improvements - PW09-0750F |
11/24/2009 |
5/17/2010 |
11/14/2011 |
| Bulbout_Crosswalk Improvements - PW09-0750F |
11/24/2009 |
5/17/2010 |
11/14/2011 |
| Stormwater Pipe Retrofit Project |
11/16/2009 |
6/21/2010 |
6/8/2010 |
| Sanitary Cured-In-Place Pipe Rehabilitation Project (Citywide) |
11/4/2009 |
4/26/2010 |
10/26/2010 |
| Stormwater Treatment Retrofit |
11/2/2009 |
2/22/2010 |
6/8/2010 |
| South Tyler Street - S 38th to S 56th |
10/20/2009 |
10/1/2009 |
3/27/2012 |
| South Tyler Street - S 38th to S 56th |
10/20/2009 |
10/1/2009 |
3/27/2012 |
| South Tacoma Pump Station AN2101 New Plug and Check Valves |
10/1/2009 |
12/18/2009 |
2/9/2010 |
| Permanent Sidewalk Improvements - PW09-0585F |
9/29/2009 |
2/18/2010 |
11/14/2011 |
| Permanent Sidewalk Improvements - PW09-0585F |
9/29/2009 |
2/18/2010 |
11/14/2011 |
| Cheney Stadium Upgrade Phase III Design Build Project |
8/14/2009 |
7/7/2010 |
1/31/2011 |
| Lincoln Ave Bridge Sanitary Line Air Vacuum release valve replacement |
8/11/2009 |
8/25/2009 |
7/23/2009 |
| BLID Structural Walk Repair |
5/28/2009 |
8/5/2009 |
7/11/2011 |
| East 34th Street Bridge Rehabilitation |
4/7/2009 |
8/6/2009 |
6/29/2010 |
| East 34th Street Bridge Rehabilitation |
4/7/2009 |
8/6/2009 |
6/29/2010 |
| Nisqually River Trestle Flood Replacement |
3/16/2009 |
6/16/2009 |
7/11/2011 |
| Puyallup River Trestle |
3/12/2009 |
2/2/2010 |
9/8/2011 |
| Landfill Gas Flare Station Upgrade |
2/18/2009 |
6/10/2009 |
9/16/2010 |
| Cheney Stadium Phase II |
12/8/2008 |
3/9/2009 |
6/15/2010 |
| Hylebos Bridge Rehabilitation |
10/28/2008 |
6/15/2009 |
11/21/2011 |
| Site 1 Esplanade (21st Street Park) |
10/28/2008 |
3/9/2009 |
5/19/2011 |
| LID8642-1,2,3,4, & 5 Five Streets (Group H) |
10/7/2008 |
4/6/2009 |
12/8/2009 |
| LID8642-1,2,3,4, & 5 Five Streets (Group H) |
10/7/2008 |
4/6/2009 |
12/8/2009 |
| Waterway Park Kayak Float |
9/23/2008 |
12/10/2008 |
7/8/2010 |
| Sector 4 Police Substation |
9/9/2008 |
2/5/2009 |
6/15/2010 |
| LID8649-1,2,3,4 Four Streets (Group K) |
7/28/2008 |
10/24/2008 |
1/13/2010 |
| LID8649-1,2,3,4 Four Streets (Group K) |
7/28/2008 |
10/24/2008 |
1/13/2010 |
| LID8653-1,2,3,4,5 & 6 Six Alleys (Group N) |
7/28/2008 |
10/24/2008 |
12/11/2009 |
| LID8653-1,2,3,4,5 & 6 Six Alleys (Group N) |
7/28/2008 |
10/24/2008 |
12/11/2009 |
| LID8648 S 69th Street Durango to Madison (Group J) |
7/15/2008 |
8/25/2008 |
1/13/2010 |
| LID8648 S 69th Street Durango to Madison (Group J) |
7/15/2008 |
8/25/2008 |
1/13/2010 |
| Earnest S Brazill Street Surface Water Improvement Project |
6/30/2008 |
9/22/2008 |
7/29/2008 |
| Hylebos Creek Septic to Sewer |
6/17/2008 |
10/6/2008 |
12/1/2008 |
| Pacific Ave - S 17th to S 25th & S 25th to C St |
5/20/2008 |
8/1/2008 |
11/15/2011 |
| Pacific Ave - S 17th to S 25th & S 25th to C St |
5/20/2008 |
8/1/2008 |
11/15/2011 |
| LID8640-1,2,3,4, & 5 Five Alleys (Group G) |
5/6/2008 |
7/22/2008 |
10/7/2009 |
| LID8640-1,2,3,4, & 5 Five Alleys (Group G) |
5/6/2008 |
7/22/2008 |
10/7/2009 |
| Sanitary Sewer Replacement - Union Ave and South 34th Street |
4/17/2008 |
8/15/2008 |
8/25/2008 |
| Landfill West Stormwater Pond |
4/16/2008 |
8/25/2008 |
12/16/2008 |
| South Tacoma Way Overlay from S. Pine St to S. 38th St |
3/11/2008 |
7/7/2008 |
5/19/2010 |
| South Tacoma Way Overlay from S. Pine St to S. 38th St |
3/11/2008 |
7/7/2008 |
5/19/2010 |
| East 44th Street |
1/8/2008 |
5/27/2008 |
6/15/2010 |
| Storm Sewer Replacement - Stadium Way from Borough Road to N 4th Street |
1/1/2008 |
8/13/2008 |
3/9/2010 |
| Sanitary Sewer Replacement on L Street from 6th Ave to 27th |
12/10/2007 |
2/25/2008 |
3/10/2008 |
| Grandview Pump Station (AN2204) Pump Skid Re-Grouting |
8/14/2007 |
9/18/2007 |
7/6/2007 |
| LID 8643 Sec 1,2,3,4 and LID 8630 Sec 5 |
8/8/2007 |
10/26/2007 |
3/7/2007 |
| LID 8643 Sec 1,2,3,4 and LID 8630 Sec 5 |
8/8/2007 |
10/26/2007 |
3/7/2007 |
| Chinese Reconciliation Park |
7/5/2007 |
1/7/2008 |
9/20/2010 |
| 2007 Annual Cured-In-Place Pipe Rehabilitation Contract |
7/3/2007 |
8/27/2007 |
2/3/2010 |
| Slayden Road - Sidewalk Only MVD to Harbor View Dr. |
6/25/2007 |
9/21/2007 |
6/27/2007 |
| Slayden Road - Sidewalk Only MVD to Harbor View Dr. |
6/25/2007 |
9/21/2007 |
6/27/2007 |
| Broadway LID 8645 |
5/22/2007 |
8/3/2007 |
1/13/2010 |
| Broadway LID 8645 |
5/22/2007 |
8/3/2007 |
1/13/2010 |
| Sanitary Extension Adams Street LID and Sanitary Sewer Replacement North 1st and G Street |
5/7/2007 |
10/10/2007 |
3/10/2008 |
| South 38th & Cedar Storm Sewer Upgrade |
4/19/2007 |
8/6/2007 |
9/28/2007 |
| South Tacoma Pump Station AN2101 Interim Upgrade |
4/18/2007 |
6/1/2007 |
7/6/2007 |
| Downtown Storm Sewer Replacement 2006 |
3/6/2007 |
5/28/2007 |
7/9/2007 |
| Water Forest - Plastic Tube Gluing |
2/13/2007 |
6/4/2007 |
6/12/2007 |
| Balfour Dock - Esplanade |
1/8/2007 |
3/15/2007 |
3/24/2010 |
| LeMay Museum Construction Documents |
1/1/2007 |
1/1/2007 |
6/6/2007 |
| Cheney Stadium Phase I |
12/27/2006 |
1/10/2007 |
6/15/2010 |
| Dock Street - S 11th ST to S 15th ST |
8/24/2006 |
1/11/2007 |
6/27/2007 |
| Dock Street - S 11th ST to S 15th ST |
8/24/2006 |
1/11/2007 |
6/27/2007 |
| LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley (Group D) |
7/25/2006 |
10/26/2006 |
6/4/2007 |
| LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley (Group D) |
7/25/2006 |
10/26/2006 |
6/4/2007 |
| LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley |
7/3/2006 |
10/4/2006 |
6/4/2007 |
| LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley |
7/3/2006 |
10/4/2006 |
6/4/2007 |
| Landfill Main Receiving Building Roof Replacement |
6/27/2006 |
10/4/2006 |
7/19/2007 |
| 13th Street Overlay from Tacoma Ave. to Pacific Ave. |
6/27/2006 |
9/13/2006 |
9/11/2006 |
| 13th Street Overlay from Tacoma Ave. to Pacific Ave. |
6/27/2006 |
9/13/2006 |
9/11/2006 |
| E 48th ST from McKinley Ave to Portland Ave |
6/12/2006 |
9/8/2006 |
11/12/2009 |
| E 48th ST from McKinley Ave to Portland Ave |
6/12/2006 |
9/8/2006 |
11/12/2009 |
| Landfill Access Improvement Project |
5/30/2006 |
10/2/2006 |
12/18/2007 |
| Crystal Springs Storm Sewer Replacement - Titlow Road to Lagoon |
5/18/2006 |
3/13/2006 |
2/1/2007 |
| White Goods Facility |
4/18/2006 |
7/28/2006 |
6/5/2007 |
| Nalley Valley Capacity |
4/10/2006 |
7/17/2006 |
5/8/2007 |
| Sanitary and Storm Sewer Replacement Project |
3/27/2006 |
7/18/2006 |
6/5/2007 |
| LID 8630 Four Streets |
2/21/2006 |
5/11/2006 |
10/27/2006 |
| LID 8630 Four Streets |
2/21/2006 |
5/11/2006 |
10/27/2006 |
| Wingate Pump Station Replacement |
2/7/2006 |
5/12/2006 |
2/27/2007 |
| L Street E Bridge Replacement |
1/17/2006 |
5/18/2006 |
6/1/2009 |
| L Street E Bridge Replacement |
1/17/2006 |
5/18/2006 |
6/1/2009 |
| Pantages Theater Remodel Phase I |
12/28/2005 |
3/29/2006 |
12/15/2005 |
| Sanitary Sewer Relocation for New TPU Admin Bldg |
12/20/2005 |
3/21/2006 |
7/12/2006 |
| Memorial Park Pump Station (AN2202) Pump Replacement |
11/8/2005 |
|
1/5/2006 |
| 2006 Annual Cured-In-Place Pipe Rehabilitation Contract |
10/25/2005 |
1/12/2006 |
7/15/2009 |
| Landfill Employee Parking Lot Expansion - Pervious Pavement Demonstration |
7/26/2005 |
10/26/2005 |
12/19/2006 |
| Tacoma Dome Streetscape |
7/5/2005 |
8/16/2005 |
7/11/2006 |
| Tacoma Dome Streetscape |
7/5/2005 |
8/16/2005 |
7/11/2006 |
| Tyler Street from S 56th Street to S 74th Street |
5/26/2005 |
8/3/2005 |
10/27/2006 |
| Tyler Street from S 56th Street to S 74th Street |
5/26/2005 |
8/3/2005 |
10/27/2006 |
| White Goods Preload |
5/17/2005 |
8/29/2005 |
6/5/2007 |
| South Tacoma Sanitary Sewer Trunk Line Replacement Project - Phase 4 |
5/6/2005 |
7/8/2005 |
2/17/2006 |
| Downtown Redevelopment |
4/26/2005 |
9/26/2005 |
4/6/2006 |
| Bicentennial Pavilion |
4/20/2005 |
6/30/2005 |
12/9/2005 |
| Earnest S Brazill Street Storm Sewer Replacement |
3/29/2005 |
6/27/2005 |
7/29/2005 |
| WSDOT Sanitary Relocation |
3/23/2005 |
5/23/2005 |
9/2/2005 |
| 2004 City-Wide Speed Humps |
3/8/2005 |
6/8/2005 |
11/3/2011 |
| 2004 City-Wide Speed Humps |
3/8/2005 |
6/8/2005 |
11/3/2011 |
| Landfill Public Receiving Facility Building-A Alterations |
3/3/2005 |
4/11/2005 |
9/2/2005 |
| Truck Wash Facility |
3/1/2005 |
6/15/2005 |
5/2/2006 |
| North 31st and Union Avenue |
2/22/2005 |
7/25/2005 |
4/3/2006 |
| Proctor Street Bridge Rehabilitation |
2/8/2005 |
9/6/2005 |
6/10/2009 |
| Proctor Street Bridge Rehabilitation |
2/8/2005 |
9/6/2005 |
6/10/2009 |
| Stormwater Facilty Maintenance - 2005 |
1/31/2005 |
7/19/2005 |
4/3/2006 |
| Pumping Station Safety Arm Installation |
1/4/2005 |
8/23/2005 |
10/13/2005 |
| ALLEYS (8) LIDS 8631 & 8632 |
12/30/2004 |
3/24/2005 |
6/28/2005 |
| ALLEYS (8) LIDS 8631 & 8632 |
12/30/2004 |
3/24/2005 |
6/28/2005 |
| South 18th Street South L St west to Dead-end |
12/29/2004 |
3/24/2005 |
6/28/2005 |
| South 18th Street South L St west to Dead-end |
12/29/2004 |
3/24/2005 |
6/28/2005 |
| Police Sector Sub-Stations |
11/30/2004 |
7/1/2005 |
6/7/2006 |
| Sanitary Sewer Rehabilitation - South Tacoma Basin 7 (Phase I) |
6/8/2004 |
8/19/2004 |
5/18/2005 |
| Greenhouse Area Preload |
5/18/2004 |
8/10/2004 |
5/2/2006 |
| Central Wastewater Treatment Plant Upgrade |
5/5/2004 |
5/3/2005 |
11/12/2010 |
| South 13th Street Storm Improvement |
5/4/2004 |
7/8/2004 |
11/30/2004 |
| N Gove-N Verde-N 42nd- N Whitworth |
4/8/2004 |
6/28/2004 |
6/9/2004 |
| N Gove-N Verde-N 42nd- N Whitworth |
4/8/2004 |
6/28/2004 |
6/9/2004 |
| Pacific Avenue - S 25th to S 28th & S 17th to S 13th Streets |
4/5/2004 |
6/23/2004 |
12/7/2009 |
| Pacific Avenue - S 25th to S 28th & S 17th to S 13th Streets |
4/5/2004 |
6/23/2004 |
12/7/2009 |
| Albers Esplanade |
3/30/2004 |
8/4/2004 |
6/1/2009 |
| South Tacoma Sanitary Sewer Trunk Line Replacement Project - Phase 3 |
3/16/2004 |
6/14/2004 |
3/25/2005 |
| Hosmer Pump Station Replacement |
1/29/2004 |
5/25/2004 |
6/30/2005 |
| Pioneer Way / River Rd - E City Limits to FAP410 |
12/11/2003 |
5/10/2004 |
6/9/2004 |
| Pioneer Way / River Rd - E City Limits to FAP410 |
12/11/2003 |
5/10/2004 |
6/9/2004 |
| Police Headquarters Facility |
12/3/2003 |
3/17/2004 |
8/25/2005 |
| Police Headquarters Facility |
12/3/2003 |
3/17/2004 |
8/25/2005 |
| Neighborhood Business Dist Sidewalk Project |
10/30/2003 |
1/19/2004 |
5/3/2004 |
| Neighborhood Business Dist Sidewalk Project |
10/30/2003 |
1/19/2004 |
5/3/2004 |
| Railroad Improvements - Frederickson to Eatonville |
9/16/2003 |
10/1/2003 |
6/8/2004 |
| Brush Cutting Frederickson Chehalis |
9/9/2003 |
|
6/8/2004 |
| Railroad Crossing Signal Upgrades - SR507 |
8/5/2003 |
9/10/2003 |
6/9/2004 |
| Norpoint Way NE -- 29th ST NE to 49th Ave NE |
7/1/2003 |
2/2/2004 |
10/27/2006 |
| Norpoint Way NE -- 29th ST NE to 49th Ave NE |
7/1/2003 |
2/2/2004 |
10/27/2006 |
| Sanitary Sewer Rehabilitation - Northend Areas |
5/26/2003 |
8/12/2003 |
10/10/2006 |
| Biosolids Processing Building Improvements |
5/20/2003 |
7/28/2003 |
7/20/2004 |
| Alaska Street from South 56th to South 38th Street |
5/5/2003 |
7/1/2003 |
2/21/2008 |
| Alaska Street from South 56th to South 38th Street |
5/5/2003 |
7/1/2003 |
2/21/2008 |
| Hazardous Sidewalk Replacement 2003 |
4/22/2003 |
7/8/2003 |
4/9/2004 |
| Hazardous Sidewalk Replacement 2003 |
4/22/2003 |
7/8/2003 |
4/9/2004 |
| Side Sewer Rehabilitation Pilot Study Phase I |
4/14/2003 |
6/4/2003 |
3/5/2004 |
| I-5 Corridor Utilities Relocation |
3/11/2003 |
5/7/2003 |
9/14/2006 |
| Police and Fleet Warehouse and Maintenance Facility |
3/4/2003 |
6/16/2003 |
6/10/2009 |
| Titlow Beach Manhole Rehab - Chemical Grout |
1/13/2003 |
4/1/2003 |
7/28/2003 |
| Sanitary Sewer Relocation and Utility Protection Bridge at Reservation Junction |
12/16/2002 |
1/8/2003 |
12/5/2003 |
| South Tacoma Pump Station Odor Control Modifications |
9/10/2002 |
11/26/2002 |
1/20/2004 |
| Downtown Area & North 49th and Gove Street |
8/28/2002 |
11/18/2002 |
10/20/2004 |
| Titlow Beach Manhole Rehab - Epoxy Coating |
8/28/2002 |
10/17/2002 |
7/28/2003 |
| Central Wastewater Treatment Plant Anaerobic Digester Band No. 6 Band Replacement |
8/27/2002 |
10/17/2002 |
3/4/2004 |
| Hood Street Storm Sewer Replacement Project |
6/17/2002 |
10/21/2002 |
9/18/2003 |
| Sanitary Sewer Mainline and Lateral Inspection |
5/21/2002 |
8/22/2002 |
2/3/2004 |
| 2011 (B) Sanitary Sewer Spot Repair Project |
|
3/2/2012 |
4/30/2012 |
| Wastewater Sewer Reroute - Sound Transit Rail Right of Way from S. 66th St. to S. 72nd St. |
|
9/21/2011 |
3/15/2012 |
| Wastewater CIPP Rehab Project (Tacoma Mall Area) |
|
9/20/2011 |
3/28/2012 |
| Wastewater Sewer Replacement Project S 48th St to S 53rd St from Fife to Wapato Streets |
|
9/9/2011 |
11/14/2011 |
| 2011 Wastewater Spot Repair Project |
|
8/31/2011 |
9/20/2011 |
| Improvements to Dock Street Yard Vaults |
|
8/16/2011 |
12/6/2011 |
| Wastewater Sewer Replacement Project - East 54th Street to South Lane from East B Street to Clarkston Street |
|
5/30/2011 |
11/14/2011 |
| N 16th & Cedar Sanitary Sewer Extension |
|
4/13/2011 |
8/2/2011 |
| Wastewater Sewer Replacement Project- 6th Avenue to South 12th Street from MacArthur Street to Hawthorne Street |
|
3/21/2011 |
11/14/2011 |
| 2010 Sanitary Sewer Spot Repair Project |
|
2/15/2011 |
5/31/2011 |
| Sanitary Sewer Reroute on Cedar St. & S. Center St. |
|
2/9/2011 |
4/25/2011 |
| North End Treatment Plant Outfall Repair |
|
12/3/2010 |
2/11/2011 |
| 2010 (B) North End Sanitary Sewer CIPP Rehab |
|
9/20/2010 |
3/28/2012 |
| CTP 72 inch Influent Pipe Rehabilitation |
|
9/20/2010 |
11/2/2010 |
| Wastewater Sewer Replacement Project Alley between South 8th and South 9th from Proctor Street to Adams Street |
|
9/1/2010 |
12/13/2010 |
| Sanitary Sewer Replacement Project M St to J St from South 48th to South 54th St |
|
6/10/2010 |
12/13/2010 |
| Sanitary Sewer Trunkline Reroute North 51st and Bennett St |
|
5/25/2010 |
12/13/2010 |
| Sanitary Cured-In-Place Pipe Rehabilitation Project (South Tacoma) |
|
4/20/2010 |
11/14/2011 |
| Automation Digester Electrical Room Upgrade CTP-042 |
|
12/1/2009 |
5/28/2010 |
| Landfill Preload Project ENV-00208 |
|
10/20/2009 |
5/3/2010 |
| 2009 Sanitary Sewer Spot Repair Project |
|
9/1/2009 |
1/12/2010 |
| Landfill 24-inch Sanitary Sewer Main Rehabilitation |
|
7/23/2009 |
10/27/2009 |
| E 11th Street Bridge Over Puyallup River |
|
9/24/2008 |
3/4/2010 |
| E 11th Street Bridge Over Puyallup River |
|
9/24/2008 |
3/4/2010 |
| Sanitary Sewer Replacement S 54th Street from Railroad Street to I-5 |
|
9/10/2008 |
10/9/2008 |
| Water Ditch Trail - TAC-40 |
|
8/21/2007 |
7/14/2006 |
| Water Ditch Trail - TAC-40 |
|
8/21/2007 |
7/14/2006 |
| Tacoma Landfill Cap Extension & Repair |
|
7/9/2007 |
7/18/2007 |
| Abatement 2004 |
|
5/15/2007 |
4/23/2007 |
| Abatement 2004 |
|
5/15/2007 |
4/23/2007 |
| Narrows Drive - N 17th St. to Orchard St. |
|
4/19/2007 |
5/29/2007 |
| Narrows Drive - N 17th St. to Orchard St. |
|
4/19/2007 |
5/29/2007 |
| Pump Station 3104 Replacement |
|
2/19/2007 |
3/23/2010 |
| Curb Ramp Construction 2004 |
|
10/3/2005 |
2/23/2006 |
| Curb Ramp Construction 2004 |
|
10/3/2005 |
2/23/2006 |
| Abatement 2003 |
|
1/10/2005 |
10/25/2004 |
| Abatement 2003 |
|
1/10/2005 |
10/25/2004 |
| Curb Ramp Construction 2003 |
|
8/6/2004 |
2/23/2006 |
| Curb Ramp Construction 2003 |
|
8/6/2004 |
2/23/2006 |
| Hazardous Sidewalk Replacement 2004 |
|
8/3/2004 |
1/6/2005 |
| Hazardous Sidewalk Replacement 2004 |
|
8/3/2004 |
1/6/2005 |
| Side Sewer Rehabilitation Pilot Study Phase II |
|
1/9/2004 |
2/8/2005 |
| Memorial Park Pump Station Relocation |
|
11/17/2003 |
8/23/2004 |
| Crystal Springs Bypass - S 16th St to Sixth Ave |
|
7/10/2003 |
10/5/2004 |
| Vista View Storm Sewer Improvement CX5152 |
|
8/26/2002 |
9/18/2003 |
| ES Building |
|
1/8/2002 |
10/21/2005 |
| LID8652-1,2,3,4, & 5 Five Alleys (Group M) |
|
|
11/14/2011 |
| LID8652-1,2,3,4, & 5 Five Alleys (Group M) |
|
|
11/14/2011 |
| DAFT Co-thickening |
|
|
4/21/2011 |
| Organic Waste to Energy |
|
|
3/28/2011 |
| Automation Future Control System Study CTP-035 |
|
|
1/31/2011 |
| Automation Design Standards CTP-020 |
|
|
1/31/2011 |
| Central Treatment Plant Upgrade Electronic Operations and Maintenance Manual |
|
|
12/7/2010 |
| Private Property Inflow & Infiltration Removal Inspection Program |
|
|
10/21/2010 |
| Side Sewer Standards |
|
|
9/24/2010 |
| Lincoln Avenue Overlay - Portland Ave to Marc Ave |
|
|
6/29/2010 |
| Lincoln Avenue Overlay - Portland Ave to Marc Ave |
|
|
6/29/2010 |
| CTP Data Historian |
|
|
5/28/2010 |
| Digester Cleaning |
|
|
3/23/2010 |
| Landfill Administration Interim Facility |
|
|
11/23/2009 |
| Septic Project |
|
|
9/2/2008 |
| Greenhouse - Grounds Maintenance Facility - Cancelled |
|
|
1/10/2008 |
| Pump Station Telemetry System Upgrade |
|
|
8/27/2007 |
| Pump Station AN4102 Pump Installation (2007) |
|
|
7/6/2007 |
| LID 8646 & 8647 Puget Sound Ave -S 40th-43rd +Alley |
|
|
6/27/2007 |
| LID 8646 & 8647 Puget Sound Ave -S 40th-43rd +Alley |
|
|
6/27/2007 |
| S 48th and Tacoma Mall Intersection Rehabilitation |
|
|
10/27/2006 |
| S 48th and Tacoma Mall Intersection Rehabilitation |
|
|
10/27/2006 |
| LINK Light Rail Pedestrian Improvments |
|
|
9/15/2006 |
| NPDES Stormwater Monitoring for Thea Foss and Wheeler-Osgood Waterways |
|
|
8/25/2006 |
| Sladen Rd. Pre-Design --MVD to Harbor View Dr. |
|
|
7/14/2006 |
| Sladen Rd. Pre-Design --MVD to Harbor View Dr. |
|
|
7/14/2006 |
| Thea Foss Remediation |
|
|
3/28/2006 |
| Thea Foss Basin, Stormwater Control Remedial Design Work Plan - Addendum |
|
|
1/6/2006 |
| South 30th and Huson Street Sanitary Sewer Overflow Analysis |
|
|
12/7/2004 |
| Hazardous Sidewalk Replacement - Saint Helens |
|
|
10/25/2004 |
| Hazardous Sidewalk Replacement - Saint Helens |
|
|
10/25/2004 |
| Manhole Rehabilitation Product Assessment Report |
|
|
10/20/2004 |
| Thea Foss Schedule |
|
|
7/28/2003 |