Completed Construction Projects

The City is involved in construction projects around Tacoma as listed below. The general project information was updated throughout each project phase as information became available to the project contacts, construction managers, inspectors and engineers. Although this page lists only completed construction projects, the Active Construction Projects around Tacoma are also viewable.
 

currently sorted by: advertise   
Project Name Advertise
Date
Construction
Date
Last
Update
South 80th Street Storm Sewer Replacement (Trafton to Alaska Street) 10/31/2011 3/5/2012 9/6/2011
Central Treatment Plant Diesel Tank Replacement 9/19/2011 11/28/2011 12/5/2011
Tacoma Landfill Gas Probe Station Abandonment 8/30/2011 12/6/2011 12/13/2011
Flett Creek Holding Basin Maintenance 8/1/2011 9/1/2011 4/13/2011
Cheney Stadium Sustainable Stormwater Project 7/19/2011 9/21/2011 11/21/2011
Lemay Access Road 6/28/2011 9/19/2011 12/20/2011
Lemay Access Road 6/28/2011 9/19/2011 12/20/2011
Sanitary Sewer Rehabilitation - Puget Gulch 4/26/2011 7/11/2011 4/2/2012
A - Street Closure 4/25/2011 6/1/2011 4/12/2011
A - Street Closure 4/25/2011 6/1/2011 4/12/2011
13th and A Street Vaulted Sidewalk Repair 3/24/2011 6/2/2011 12/20/2011
Central Area Landfill Closure Phase I 3/8/2011 6/13/2011 2/21/2012
Morton Washout 1/21/2011 3/4/2011 9/8/2011
Commerce Street Station 1/17/2011 5/9/2011 9/30/2011
Commerce Street Station 1/17/2011 5/9/2011 9/30/2011
EPS Recycling Facility 1/11/2011 4/15/2011 10/3/2011
Lincoln Ave - Portland to Mar Ave (Bridge) 12/14/2010 5/31/2011 3/9/2012
Lincoln Ave - Portland to Mar Ave (Bridge) 12/14/2010 5/31/2011 3/9/2012
Sauro Property Parking Lot 12/7/2010 2/11/2011 8/2/2011
Foss Waterway Seaport 11/9/2010 1/14/2011 8/3/2011
Titlow Beach Seawall Repair 11/1/2010 1/10/2011 2/13/2012
Titlow Beach Seawall Repair 11/1/2010 1/10/2011 2/13/2012
North End Treatment Plant - Disinfection System Replacement 10/18/2010 1/3/2011 4/5/2011
China Lake Pump Station AN2111 Pump and Valve Installation 9/2/2010 10/28/2010 4/14/2011
Marine View Drive Pump Station AN4103 Force Main Replacement 8/13/2010 11/5/2010 4/21/2011
Top 4 Bike Trails Design 7/19/2010 10/18/2010 3/10/2011
Top 4 Bike Trails Design 7/19/2010 10/18/2010 3/10/2011
6th Avenue Parking 6/29/2010 8/30/2010 8/15/2011
Fife Street Parking and Overlay Project 6/29/2010 8/30/2010 8/15/2011
Fife Street Parking and Overlay Project 6/29/2010 8/30/2010 8/15/2011
CTP Safety Improvements for Personnel - Tagro Push Walls 6/16/2010 8/10/2010 6/8/2010
Landfill Administration Building/Shop 4 Improvements 6/8/2010 9/2/2010 10/17/2011
Tacoma Dome Parking Lot C Surface Water & Sanitary Sewer Utility Relocation 6/1/2010 8/30/2010 7/8/2010
North 11th Jackson Street ( Scott Pierson Trail) 6/1/2010 8/6/2010 5/19/2011
LID8651-1,2,3, & 4 Four Streets (Group L) 5/18/2010 8/9/2010 3/27/2012
LID8651-1,2,3, & 4 Four Streets (Group L) 5/18/2010 8/9/2010 3/27/2012
North 26th Street ADA Ramp upgrades 5/4/2010 6/28/2010 5/23/2011
North 26th Street ADA Ramp upgrades 5/4/2010 6/28/2010 5/23/2011
Salishan Area 2B Landscaping & Irrigation 4/30/2010 8/9/2010 5/6/2010
Rehabilitation of the Spanish Steps 4/27/2010 8/2/2010 5/19/2011
South 34th Street Signal 4/9/2010 7/2/2010 10/29/2010
2008 Sidewalk Maintenance Program - Phase 3 4/6/2010 7/27/2010 2/18/2010
2008 Sidewalk Maintenance Program - Phase 3 4/6/2010 7/27/2010 2/18/2010
2010 Sidewalk Ramp Construction 4/6/2010 6/21/2010 6/14/2010
2010 Sidewalk Ramp Construction 4/6/2010 6/21/2010 6/14/2010
Portland Ave. Overlay - E 28th to E 56th ST 3/30/2010 6/1/2010 9/29/2010
Portland Ave. Overlay - E 28th to E 56th ST 3/30/2010 6/1/2010 9/29/2010
Varco Road Improvements 3/24/2010 5/25/2010 6/8/2010
Solid Waste Management Recovery and Transfer Center 3/16/2010 8/3/2010 12/1/2011
LID8644-1,2,3,4, & 5 Five Alleys (Group I) 3/16/2010 6/21/2010 11/14/2011
LID8644-1,2,3,4, & 5 Five Alleys (Group I) 3/16/2010 6/21/2010 11/14/2011
Jefferson Street Surface Water Improvement Project 3/16/2010 6/15/2010 12/6/2010
Foss Waterway North Moorage Float Phase II 3/16/2010 5/12/2010 3/22/2011
Snake Lake Water Quality Project 3/8/2010 6/7/2010 7/22/2011
Gas Extraction System Rehabilitation 3/2/2010 6/14/2010 7/21/2010
Tacoma Rail C-Line Improvements 2/2/2010 6/1/2010 7/11/2011
Pacific Ave Pedestrian and Bike improvements 1/20/2010 5/4/2010 11/14/2011
Pacific Ave Pedestrian and Bike improvements 1/20/2010 5/4/2010 11/14/2011
Site 11 Esplanade (Foss Harbor) 12/4/2009 2/1/2010 6/22/2011
Bulbout_Crosswalk Improvements - PW09-0750F 11/24/2009 5/17/2010 11/14/2011
Bulbout_Crosswalk Improvements - PW09-0750F 11/24/2009 5/17/2010 11/14/2011
Stormwater Pipe Retrofit Project 11/16/2009 6/21/2010 6/8/2010
Sanitary Cured-In-Place Pipe Rehabilitation Project (Citywide) 11/4/2009 4/26/2010 10/26/2010
Stormwater Treatment Retrofit 11/2/2009 2/22/2010 6/8/2010
South Tyler Street - S 38th to S 56th 10/20/2009 10/1/2009 3/27/2012
South Tyler Street - S 38th to S 56th 10/20/2009 10/1/2009 3/27/2012
South Tacoma Pump Station AN2101 New Plug and Check Valves 10/1/2009 12/18/2009 2/9/2010
Permanent Sidewalk Improvements - PW09-0585F 9/29/2009 2/18/2010 11/14/2011
Permanent Sidewalk Improvements - PW09-0585F 9/29/2009 2/18/2010 11/14/2011
Cheney Stadium Upgrade Phase III Design Build Project 8/14/2009 7/7/2010 1/31/2011
Lincoln Ave Bridge Sanitary Line Air Vacuum release valve replacement 8/11/2009 8/25/2009 7/23/2009
BLID Structural Walk Repair 5/28/2009 8/5/2009 7/11/2011
East 34th Street Bridge Rehabilitation 4/7/2009 8/6/2009 6/29/2010
East 34th Street Bridge Rehabilitation 4/7/2009 8/6/2009 6/29/2010
Nisqually River Trestle Flood Replacement 3/16/2009 6/16/2009 7/11/2011
Puyallup River Trestle 3/12/2009 2/2/2010 9/8/2011
Landfill Gas Flare Station Upgrade 2/18/2009 6/10/2009 9/16/2010
Cheney Stadium Phase II 12/8/2008 3/9/2009 6/15/2010
Hylebos Bridge Rehabilitation 10/28/2008 6/15/2009 11/21/2011
Site 1 Esplanade (21st Street Park) 10/28/2008 3/9/2009 5/19/2011
LID8642-1,2,3,4, & 5 Five Streets (Group H) 10/7/2008 4/6/2009 12/8/2009
LID8642-1,2,3,4, & 5 Five Streets (Group H) 10/7/2008 4/6/2009 12/8/2009
Waterway Park Kayak Float 9/23/2008 12/10/2008 7/8/2010
Sector 4 Police Substation 9/9/2008 2/5/2009 6/15/2010
LID8649-1,2,3,4 Four Streets (Group K) 7/28/2008 10/24/2008 1/13/2010
LID8649-1,2,3,4 Four Streets (Group K) 7/28/2008 10/24/2008 1/13/2010
LID8653-1,2,3,4,5 & 6 Six Alleys (Group N) 7/28/2008 10/24/2008 12/11/2009
LID8653-1,2,3,4,5 & 6 Six Alleys (Group N) 7/28/2008 10/24/2008 12/11/2009
LID8648 S 69th Street Durango to Madison (Group J) 7/15/2008 8/25/2008 1/13/2010
LID8648 S 69th Street Durango to Madison (Group J) 7/15/2008 8/25/2008 1/13/2010
Earnest S Brazill Street Surface Water Improvement Project 6/30/2008 9/22/2008 7/29/2008
Hylebos Creek Septic to Sewer 6/17/2008 10/6/2008 12/1/2008
Pacific Ave - S 17th to S 25th & S 25th to C St 5/20/2008 8/1/2008 11/15/2011
Pacific Ave - S 17th to S 25th & S 25th to C St 5/20/2008 8/1/2008 11/15/2011
LID8640-1,2,3,4, & 5 Five Alleys (Group G) 5/6/2008 7/22/2008 10/7/2009
LID8640-1,2,3,4, & 5 Five Alleys (Group G) 5/6/2008 7/22/2008 10/7/2009
Sanitary Sewer Replacement - Union Ave and South 34th Street 4/17/2008 8/15/2008 8/25/2008
Landfill West Stormwater Pond 4/16/2008 8/25/2008 12/16/2008
South Tacoma Way Overlay from S. Pine St to S. 38th St 3/11/2008 7/7/2008 5/19/2010
South Tacoma Way Overlay from S. Pine St to S. 38th St 3/11/2008 7/7/2008 5/19/2010
East 44th Street 1/8/2008 5/27/2008 6/15/2010
Storm Sewer Replacement - Stadium Way from Borough Road to N 4th Street 1/1/2008 8/13/2008 3/9/2010
Sanitary Sewer Replacement on L Street from 6th Ave to 27th 12/10/2007 2/25/2008 3/10/2008
Grandview Pump Station (AN2204) Pump Skid Re-Grouting 8/14/2007 9/18/2007 7/6/2007
LID 8643 Sec 1,2,3,4 and LID 8630 Sec 5 8/8/2007 10/26/2007 3/7/2007
LID 8643 Sec 1,2,3,4 and LID 8630 Sec 5 8/8/2007 10/26/2007 3/7/2007
Chinese Reconciliation Park 7/5/2007 1/7/2008 9/20/2010
2007 Annual Cured-In-Place Pipe Rehabilitation Contract 7/3/2007 8/27/2007 2/3/2010
Slayden Road - Sidewalk Only MVD to Harbor View Dr. 6/25/2007 9/21/2007 6/27/2007
Slayden Road - Sidewalk Only MVD to Harbor View Dr. 6/25/2007 9/21/2007 6/27/2007
Broadway LID 8645 5/22/2007 8/3/2007 1/13/2010
Broadway LID 8645 5/22/2007 8/3/2007 1/13/2010
Sanitary Extension Adams Street LID and Sanitary Sewer Replacement North 1st and G Street 5/7/2007 10/10/2007 3/10/2008
South 38th & Cedar Storm Sewer Upgrade 4/19/2007 8/6/2007 9/28/2007
South Tacoma Pump Station AN2101 Interim Upgrade 4/18/2007 6/1/2007 7/6/2007
Downtown Storm Sewer Replacement 2006 3/6/2007 5/28/2007 7/9/2007
Water Forest - Plastic Tube Gluing 2/13/2007 6/4/2007 6/12/2007
Balfour Dock - Esplanade 1/8/2007 3/15/2007 3/24/2010
LeMay Museum Construction Documents 1/1/2007 1/1/2007 6/6/2007
Cheney Stadium Phase I 12/27/2006 1/10/2007 6/15/2010
Dock Street - S 11th ST to S 15th ST 8/24/2006 1/11/2007 6/27/2007
Dock Street - S 11th ST to S 15th ST 8/24/2006 1/11/2007 6/27/2007
LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley (Group D) 7/25/2006 10/26/2006 6/4/2007
LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley (Group D) 7/25/2006 10/26/2006 6/4/2007
LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley 7/3/2006 10/4/2006 6/4/2007
LID8639 and 8641 Visscher-Cheyanne-Gove-Shirley 7/3/2006 10/4/2006 6/4/2007
Landfill Main Receiving Building Roof Replacement 6/27/2006 10/4/2006 7/19/2007
13th Street Overlay from Tacoma Ave. to Pacific Ave. 6/27/2006 9/13/2006 9/11/2006
13th Street Overlay from Tacoma Ave. to Pacific Ave. 6/27/2006 9/13/2006 9/11/2006
E 48th ST from McKinley Ave to Portland Ave 6/12/2006 9/8/2006 11/12/2009
E 48th ST from McKinley Ave to Portland Ave 6/12/2006 9/8/2006 11/12/2009
Landfill Access Improvement Project 5/30/2006 10/2/2006 12/18/2007
Crystal Springs Storm Sewer Replacement - Titlow Road to Lagoon 5/18/2006 3/13/2006 2/1/2007
White Goods Facility 4/18/2006 7/28/2006 6/5/2007
Nalley Valley Capacity 4/10/2006 7/17/2006 5/8/2007
Sanitary and Storm Sewer Replacement Project 3/27/2006 7/18/2006 6/5/2007
LID 8630 Four Streets 2/21/2006 5/11/2006 10/27/2006
LID 8630 Four Streets 2/21/2006 5/11/2006 10/27/2006
Wingate Pump Station Replacement 2/7/2006 5/12/2006 2/27/2007
L Street E Bridge Replacement 1/17/2006 5/18/2006 6/1/2009
L Street E Bridge Replacement 1/17/2006 5/18/2006 6/1/2009
Pantages Theater Remodel Phase I 12/28/2005 3/29/2006 12/15/2005
Sanitary Sewer Relocation for New TPU Admin Bldg 12/20/2005 3/21/2006 7/12/2006
Memorial Park Pump Station (AN2202) Pump Replacement 11/8/2005   1/5/2006
2006 Annual Cured-In-Place Pipe Rehabilitation Contract 10/25/2005 1/12/2006 7/15/2009
Landfill Employee Parking Lot Expansion - Pervious Pavement Demonstration 7/26/2005 10/26/2005 12/19/2006
Tacoma Dome Streetscape 7/5/2005 8/16/2005 7/11/2006
Tacoma Dome Streetscape 7/5/2005 8/16/2005 7/11/2006
Tyler Street from S 56th Street to S 74th Street 5/26/2005 8/3/2005 10/27/2006
Tyler Street from S 56th Street to S 74th Street 5/26/2005 8/3/2005 10/27/2006
White Goods Preload 5/17/2005 8/29/2005 6/5/2007
South Tacoma Sanitary Sewer Trunk Line Replacement Project - Phase 4 5/6/2005 7/8/2005 2/17/2006
Downtown Redevelopment 4/26/2005 9/26/2005 4/6/2006
Bicentennial Pavilion 4/20/2005 6/30/2005 12/9/2005
Earnest S Brazill Street Storm Sewer Replacement 3/29/2005 6/27/2005 7/29/2005
WSDOT Sanitary Relocation 3/23/2005 5/23/2005 9/2/2005
2004 City-Wide Speed Humps 3/8/2005 6/8/2005 11/3/2011
2004 City-Wide Speed Humps 3/8/2005 6/8/2005 11/3/2011
Landfill Public Receiving Facility Building-A Alterations 3/3/2005 4/11/2005 9/2/2005
Truck Wash Facility 3/1/2005 6/15/2005 5/2/2006
North 31st and Union Avenue 2/22/2005 7/25/2005 4/3/2006
Proctor Street Bridge Rehabilitation 2/8/2005 9/6/2005 6/10/2009
Proctor Street Bridge Rehabilitation 2/8/2005 9/6/2005 6/10/2009
Stormwater Facilty Maintenance - 2005 1/31/2005 7/19/2005 4/3/2006
Pumping Station Safety Arm Installation 1/4/2005 8/23/2005 10/13/2005
ALLEYS (8) LIDS 8631 & 8632 12/30/2004 3/24/2005 6/28/2005
ALLEYS (8) LIDS 8631 & 8632 12/30/2004 3/24/2005 6/28/2005
South 18th Street South L St west to Dead-end 12/29/2004 3/24/2005 6/28/2005
South 18th Street South L St west to Dead-end 12/29/2004 3/24/2005 6/28/2005
Police Sector Sub-Stations 11/30/2004 7/1/2005 6/7/2006
Sanitary Sewer Rehabilitation - South Tacoma Basin 7 (Phase I) 6/8/2004 8/19/2004 5/18/2005
Greenhouse Area Preload 5/18/2004 8/10/2004 5/2/2006
Central Wastewater Treatment Plant Upgrade 5/5/2004 5/3/2005 11/12/2010
South 13th Street Storm Improvement 5/4/2004 7/8/2004 11/30/2004
N Gove-N Verde-N 42nd- N Whitworth 4/8/2004 6/28/2004 6/9/2004
N Gove-N Verde-N 42nd- N Whitworth 4/8/2004 6/28/2004 6/9/2004
Pacific Avenue - S 25th to S 28th & S 17th to S 13th Streets 4/5/2004 6/23/2004 12/7/2009
Pacific Avenue - S 25th to S 28th & S 17th to S 13th Streets 4/5/2004 6/23/2004 12/7/2009
Albers Esplanade 3/30/2004 8/4/2004 6/1/2009
South Tacoma Sanitary Sewer Trunk Line Replacement Project - Phase 3 3/16/2004 6/14/2004 3/25/2005
Hosmer Pump Station Replacement 1/29/2004 5/25/2004 6/30/2005
Pioneer Way / River Rd - E City Limits to FAP410 12/11/2003 5/10/2004 6/9/2004
Pioneer Way / River Rd - E City Limits to FAP410 12/11/2003 5/10/2004 6/9/2004
Police Headquarters Facility 12/3/2003 3/17/2004 8/25/2005
Police Headquarters Facility 12/3/2003 3/17/2004 8/25/2005
Neighborhood Business Dist Sidewalk Project 10/30/2003 1/19/2004 5/3/2004
Neighborhood Business Dist Sidewalk Project 10/30/2003 1/19/2004 5/3/2004
Railroad Improvements - Frederickson to Eatonville 9/16/2003 10/1/2003 6/8/2004
Brush Cutting Frederickson Chehalis 9/9/2003   6/8/2004
Railroad Crossing Signal Upgrades - SR507 8/5/2003 9/10/2003 6/9/2004
Norpoint Way NE -- 29th ST NE to 49th Ave NE 7/1/2003 2/2/2004 10/27/2006
Norpoint Way NE -- 29th ST NE to 49th Ave NE 7/1/2003 2/2/2004 10/27/2006
Sanitary Sewer Rehabilitation - Northend Areas 5/26/2003 8/12/2003 10/10/2006
Biosolids Processing Building Improvements 5/20/2003 7/28/2003 7/20/2004
Alaska Street from South 56th to South 38th Street 5/5/2003 7/1/2003 2/21/2008
Alaska Street from South 56th to South 38th Street 5/5/2003 7/1/2003 2/21/2008
Hazardous Sidewalk Replacement 2003 4/22/2003 7/8/2003 4/9/2004
Hazardous Sidewalk Replacement 2003 4/22/2003 7/8/2003 4/9/2004
Side Sewer Rehabilitation Pilot Study Phase I 4/14/2003 6/4/2003 3/5/2004
I-5 Corridor Utilities Relocation 3/11/2003 5/7/2003 9/14/2006
Police and Fleet Warehouse and Maintenance Facility 3/4/2003 6/16/2003 6/10/2009
Titlow Beach Manhole Rehab - Chemical Grout 1/13/2003 4/1/2003 7/28/2003
Sanitary Sewer Relocation and Utility Protection Bridge at Reservation Junction 12/16/2002 1/8/2003 12/5/2003
South Tacoma Pump Station Odor Control Modifications 9/10/2002 11/26/2002 1/20/2004
Downtown Area & North 49th and Gove Street 8/28/2002 11/18/2002 10/20/2004
Titlow Beach Manhole Rehab - Epoxy Coating 8/28/2002 10/17/2002 7/28/2003
Central Wastewater Treatment Plant Anaerobic Digester Band No. 6 Band Replacement 8/27/2002 10/17/2002 3/4/2004
Hood Street Storm Sewer Replacement Project 6/17/2002 10/21/2002 9/18/2003
Sanitary Sewer Mainline and Lateral Inspection 5/21/2002 8/22/2002 2/3/2004
2011 (B) Sanitary Sewer Spot Repair Project   3/2/2012 4/30/2012
Wastewater Sewer Reroute - Sound Transit Rail Right of Way from S. 66th St. to S. 72nd St.   9/21/2011 3/15/2012
Wastewater CIPP Rehab Project (Tacoma Mall Area)   9/20/2011 3/28/2012
Wastewater Sewer Replacement Project S 48th St to S 53rd St from Fife to Wapato Streets   9/9/2011 11/14/2011
2011 Wastewater Spot Repair Project   8/31/2011 9/20/2011
Improvements to Dock Street Yard Vaults   8/16/2011 12/6/2011
Wastewater Sewer Replacement Project - East 54th Street to South Lane from East B Street to Clarkston Street   5/30/2011 11/14/2011
N 16th & Cedar Sanitary Sewer Extension   4/13/2011 8/2/2011
Wastewater Sewer Replacement Project- 6th Avenue to South 12th Street from MacArthur Street to Hawthorne Street   3/21/2011 11/14/2011
2010 Sanitary Sewer Spot Repair Project   2/15/2011 5/31/2011
Sanitary Sewer Reroute on Cedar St. & S. Center St.   2/9/2011 4/25/2011
North End Treatment Plant Outfall Repair   12/3/2010 2/11/2011
2010 (B) North End Sanitary Sewer CIPP Rehab   9/20/2010 3/28/2012
CTP 72 inch Influent Pipe Rehabilitation   9/20/2010 11/2/2010
Wastewater Sewer Replacement Project Alley between South 8th and South 9th from Proctor Street to Adams Street   9/1/2010 12/13/2010
Sanitary Sewer Replacement Project M St to J St from South 48th to South 54th St   6/10/2010 12/13/2010
Sanitary Sewer Trunkline Reroute North 51st and Bennett St   5/25/2010 12/13/2010
Sanitary Cured-In-Place Pipe Rehabilitation Project (South Tacoma)   4/20/2010 11/14/2011
Automation Digester Electrical Room Upgrade CTP-042   12/1/2009 5/28/2010
Landfill Preload Project ENV-00208   10/20/2009 5/3/2010
2009 Sanitary Sewer Spot Repair Project   9/1/2009 1/12/2010
Landfill 24-inch Sanitary Sewer Main Rehabilitation   7/23/2009 10/27/2009
E 11th Street Bridge Over Puyallup River   9/24/2008 3/4/2010
E 11th Street Bridge Over Puyallup River   9/24/2008 3/4/2010
Sanitary Sewer Replacement S 54th Street from Railroad Street to I-5   9/10/2008 10/9/2008
Water Ditch Trail - TAC-40   8/21/2007 7/14/2006
Water Ditch Trail - TAC-40   8/21/2007 7/14/2006
Tacoma Landfill Cap Extension & Repair   7/9/2007 7/18/2007
Abatement 2004   5/15/2007 4/23/2007
Abatement 2004   5/15/2007 4/23/2007
Narrows Drive - N 17th St. to Orchard St.   4/19/2007 5/29/2007
Narrows Drive - N 17th St. to Orchard St.   4/19/2007 5/29/2007
Pump Station 3104 Replacement   2/19/2007 3/23/2010
Curb Ramp Construction 2004   10/3/2005 2/23/2006
Curb Ramp Construction 2004   10/3/2005 2/23/2006
Abatement 2003   1/10/2005 10/25/2004
Abatement 2003   1/10/2005 10/25/2004
Curb Ramp Construction 2003   8/6/2004 2/23/2006
Curb Ramp Construction 2003   8/6/2004 2/23/2006
Hazardous Sidewalk Replacement 2004   8/3/2004 1/6/2005
Hazardous Sidewalk Replacement 2004   8/3/2004 1/6/2005
Side Sewer Rehabilitation Pilot Study Phase II   1/9/2004 2/8/2005
Memorial Park Pump Station Relocation   11/17/2003 8/23/2004
Crystal Springs Bypass - S 16th St to Sixth Ave   7/10/2003 10/5/2004
Vista View Storm Sewer Improvement CX5152   8/26/2002 9/18/2003
ES Building   1/8/2002 10/21/2005
LID8652-1,2,3,4, & 5 Five Alleys (Group M)     11/14/2011
LID8652-1,2,3,4, & 5 Five Alleys (Group M)     11/14/2011
DAFT Co-thickening     4/21/2011
Organic Waste to Energy     3/28/2011
Automation Future Control System Study CTP-035     1/31/2011
Automation Design Standards CTP-020     1/31/2011
Central Treatment Plant Upgrade Electronic Operations and Maintenance Manual     12/7/2010
Private Property Inflow & Infiltration Removal Inspection Program     10/21/2010
Side Sewer Standards     9/24/2010
Lincoln Avenue Overlay - Portland Ave to Marc Ave     6/29/2010
Lincoln Avenue Overlay - Portland Ave to Marc Ave     6/29/2010
CTP Data Historian     5/28/2010
Digester Cleaning     3/23/2010
Landfill Administration Interim Facility     11/23/2009
Septic Project     9/2/2008
Greenhouse - Grounds Maintenance Facility - Cancelled     1/10/2008
Pump Station Telemetry System Upgrade     8/27/2007
Pump Station AN4102 Pump Installation (2007)     7/6/2007
LID 8646 & 8647 Puget Sound Ave -S 40th-43rd +Alley     6/27/2007
LID 8646 & 8647 Puget Sound Ave -S 40th-43rd +Alley     6/27/2007
S 48th and Tacoma Mall Intersection Rehabilitation     10/27/2006
S 48th and Tacoma Mall Intersection Rehabilitation     10/27/2006
LINK Light Rail Pedestrian Improvments     9/15/2006
NPDES Stormwater Monitoring for Thea Foss and Wheeler-Osgood Waterways     8/25/2006
Sladen Rd. Pre-Design --MVD to Harbor View Dr.     7/14/2006
Sladen Rd. Pre-Design --MVD to Harbor View Dr.     7/14/2006
Thea Foss Remediation     3/28/2006
Thea Foss Basin, Stormwater Control Remedial Design Work Plan - Addendum     1/6/2006
South 30th and Huson Street Sanitary Sewer Overflow Analysis     12/7/2004
Hazardous Sidewalk Replacement - Saint Helens     10/25/2004
Hazardous Sidewalk Replacement - Saint Helens     10/25/2004
Manhole Rehabilitation Product Assessment Report     10/20/2004
Thea Foss Schedule     7/28/2003