Active Construction Projects

The City is involved in a number of active construction projects around Tacoma. Check this page for information about major projects, such as the D Street Overpass project near the Thea Foss Waterway and the Central Treatment Plant upgrade and expansion project.

This page and its subsections will be updated as information changes during these projects. You can also view Completed Construction Projects around Tacoma.
 

currently sorted by: advertise   
Project Name Advertise
Date
Construction
Date
Last
Update
Cleveland Way Pump Station 3/31/2014 6/30/2014 9/6/2011
UPPER TACOMA MLK LID - Admin and Support for Development 12/2/2013 2/21/2014 8/16/2011
Puyallup Ave Bridge - F16A & F16B Replacement 3/12/2013 7/16/2013 1/26/2012
Puyallup Ave Bridge - F16A & F16B Replacement 3/12/2013 7/16/2013 1/26/2012
South Tacoma Way S.43rd to S.47th & S.56th to S.66th 1/8/2013 9/10/2013 1/31/2012
South Tacoma Way S.43rd to S.47th & S.56th to S.66th 1/8/2013 9/10/2013 1/31/2012
Prairie Line Trail 1/1/2013 4/2/2013 11/14/2011
Prairie Line Trail 1/1/2013 4/2/2013 11/14/2011
Old Town Dock 6/18/2012 8/13/2012 12/20/2011
Wastewater Sewer Main Replacement - N 43rd St to N Ruby St from Pearl St to Baltimore St 6/5/2012 8/7/2012 1/12/2012
Wapato Lake Drive Pervious Street 5/22/2012 7/17/2012 1/24/2012
Leach Creek Holding Basin Maintenance 5/7/2012 7/23/2012 9/6/2011
Sanitary Sewer Main Replacement Phae II- C Street South 26th to South 21st Street and Court A South 25th to South 21st Street. 5/1/2012 6/14/2012 1/5/2012
Water Ditch Trail 4/24/2012 7/24/2012 1/4/2012
Water Ditch Trail 4/24/2012 7/24/2012 1/4/2012
Lincoln and Alexander Pump Station AN4102 Upgrade 4/23/2012 6/18/2012 11/8/2011
56th and Cushman Storm Improvements 4/2/2012 7/23/2012 9/6/2011
Asphalt Plant Remediation 3/21/2012 6/26/2012 10/18/2011
Pacific Ave. Safety & Mobilty Improvements 3/7/2012 6/7/2012 1/31/2012
Pacific Ave. Safety & Mobilty Improvements 3/7/2012 6/7/2012 1/31/2012
Central Area Landfill Closure Phase II 3/5/2012 6/8/2012 2/1/2012
Pacific Avenue Streetscape 2/6/2012 4/27/2012 1/26/2012
Flett Creek Pump Station 2/6/2012 4/2/2012 11/15/2011
Firemans Park Safety Improvement s Upgrades 1/31/2012 4/6/2012 12/20/2011
Hylebos View Pump Station AN4111 and Vista View Pump Station AN1202 Pump Replacements 1/18/2012 4/3/2012 11/8/2011
Downtown Storm Pipe Replacement (FS05) 1/11/2012 2/2/2012 9/6/2011
Thea Foss Waterway Esplanade Site 11 Phase 2 1/10/2012 4/27/2012 12/20/2011
The Central Wastewater Treatment Plant High Purity Oxygen Generation System Improvements (PSA Upgrade) 1/10/2012 4/3/2012 1/27/2012
East 15th and St. Paul Avenue Storm Sewer Replacement 12/23/2011 1/4/2012 9/6/2011
Stadium Way - S 9th to Tacoma Ave 12/13/2011 4/2/2012 1/26/2012
Stadium Way - S 9th to Tacoma Ave 12/13/2011 4/2/2012 1/26/2012
Bayview Site Improvements 12/6/2011 3/13/2012 12/13/2011
South 80th Street Storm Sewer Replacement (Trafton to Alaska Street) 10/31/2011 3/5/2012 9/6/2011
Tacoma Rail - Blakeslee Junction 8/16/2011 1/30/2012 1/26/2012
Pothole Streets 2011 8/15/2011 3/27/2012 1/6/2012
Pothole Streets 2011 8/15/2011 3/27/2012 1/6/2012
Cheney Stadium Sustainable Stormwater Project 7/19/2011 9/21/2011 11/21/2011
Alaska Street South 72nd to South 56th Street 7/5/2011 10/3/2011 1/31/2012
Alaska Street South 72nd to South 56th Street 7/5/2011 10/3/2011 1/31/2012
Marine View Drive Pump Station AN4103 Upgrade 6/7/2011 8/17/2011 11/8/2011
9th Street LINK Improvements 5/16/2011 10/7/2011 1/26/2012
9th Street LINK Improvements 5/16/2011 10/7/2011 1/26/2012
Puget Sound Local Haul Truck Diesel Retrofit Program 5/3/2011 10/24/2011 8/2/2011
Sanitary Sewer Rehabilitation - Puget Gulch 4/26/2011 7/11/2011 1/31/2012
Lower Salmon Beach Pump Station AN1304 Upgrade 3/29/2011 7/6/2011 11/8/2011
Central Area Landfill Closure Phase I 3/8/2011 6/13/2011 2/1/2012
Lincoln Ave - Portland to Mar Ave (Bridge) 12/14/2010 5/31/2011 1/26/2012
Lincoln Ave - Portland to Mar Ave (Bridge) 12/14/2010 5/31/2011 1/26/2012
Murray Morgan Bridge Rehabilitation 5/3/2010 1/5/2011 8/9/2011
Thea Foss Waterway Groundwater Monitoring 12/28/2009 7/14/2010 8/3/2011
Sauro Property Cleanup Project 7/23/2009 10/1/2009 9/7/2011
Construction of ADA Compliance Upgrades at City Owned Facilties 7/7/2009 11/30/2009 3/29/2011
Hylebos Bridge Rehabilitation 10/28/2008 6/15/2009 11/21/2011
Dewatering Sytem Upgrade   12/17/2012 1/3/2012
Wastewater Sewer Main Replacement - N 49th St to N 51st St from Vassault St to Pearl St   8/2/2012 2/9/2012
Wastewater Sewer Main Replacement - N 38th St to N 42nd St from Pearl St to Orchard St   7/9/2012 2/9/2012
Wastewater Sewer Main Replacement - N 51st St to N Park Ave from Vassault to Pearl   7/2/2012 2/9/2012
Phase I - Downtown Utilities Improvement Project   6/22/2012 1/24/2012
Wastewater Sewer Main Replacement - N 42nd St to N 49th St from Bristol St to Pearl St   6/18/2012 2/9/2012
LID 3968 East 49th Street Sanitary Sewer Main Extension   4/20/2012 1/13/2012
Wastewater Sewer Replacement Project - Frace to Vassault Street from N 49th Street to N 51st Street   4/2/2012 2/9/2012
Wastewater Sewer Replacement Project - S 15th from Tacoma Ave to Fawcett   2/24/2012 1/24/2012
2011(B) Wastewater Sewer Replacement Project   2/24/2012 1/24/2012
Sanitary Sewer Replacements in Various Tacoma Locations   1/24/2012 1/9/2012
Wastewater Sewer Main Replacement - Stevens Street from Mid-N. 21st Street to Mid-N. 27th Street   10/14/2011 1/9/2012
Sanitary Sewer reroute - South Tacoma Way (S. 66th to S. 72nd) and S. 38th St. from Yakima Ave. to Park Ave.   9/21/2011 1/20/2012
Wastewater CIPP Rehab Project (Tacoma Mall Area)   9/20/2011 1/25/2012
Decant Facility   9/9/2011 9/7/2011
On-Call Wastewater Sewer & Side Sewer Connection Repair Project   9/6/2011 11/14/2011
Septage Receiving Facility   9/1/2011 5/25/2011
2010 (B) North End Sanitary Sewer CIPP Rehab   9/20/2010 1/25/2012
Central Treatment Plant eO&M Manual Phase II     1/27/2012
CTP Safety Improvements for Personnel - Clarifier Access Improvement     1/13/2012
Control System Upgrade     12/23/2011
Central Wastewater Treatment Plant Flood Protection     12/5/2011
Central Treatment Plant Secondary Clarifier Skirt Baffle Extension and Testing     9/17/2010